Overview
-
Rail
Project type -
$46 million
Total budget -
Complete
Project phase -
METRONET
Lead agency -
100
Jobs supported
A new assembly and commissioning facility has been built in Bellevue as part of the WA Railcar Program, which will deliver 246 new railcars required for METRONET projects and the subsequent retirement of the A-series trains.
Situated at the end of the Midland Line, the site in Bellevue is an ideal location to assemble and commission new railcars.
The main facility includes a 180m-long building with a railcar assembly area, offices, workshops and storage areas, two overhead cranes and a heavy maintenance railroad with a crane capable of lifting 10 tonne.
The completion of the High Voltage Testing and Commissioning Facility at the site means railcars can now undertake their extensive testing regime here in WA.
In mid-2022 the first full six-car C-series train built in Western Australia completed high-voltage testing and moved out of the Bellevue facility to begin about 12 months of intensive dynamic testing.
The first fully completed train, fitted out with close to 400 seats, was revealed in June 2023 and have been in operation since April 2024 on the Joondalup and Mandurah lines. New railcars will roll out from this facility for years to come.