Mandurah Estuary Bridge Bridge upgrade

Mandurah

Overview

  • Road

    Project type
  • $136 million

    Total budget
  • Under Construction

    Project phase
  • Main Roads WA

    Lead agency
  • 500

    Jobs supported
  • Early 2024

    Start date

    Late 2025

    End date

Construction continues on a second, two-lane bridge on the south side of the existing Mandurah Estuary Bridge.

With more than 33,000 vehicles using the existing bridge per day, the bridge duplication will help meet the increased demand created by population growth across Perth, Mandurah, Peel and the South West. Provision for a future third lane in each direction has been included in the project scope.

All piling has been completed and in November 2024, the first bridge segment was incrementally launched towards the waterway from the south-east side.

A four-metre-wide shared path will be constructed under the bridge, better connecting those walking, riding or wheeling. A new accessible fishing platform is also being constructed to enable people of all abilities to enjoy the area.

The bridge is expected to be open by late-2025, with finishing works continuing into early-2026.

Find more information on the Main Roads WA project here.

Benefits

  • Provision of additional traffic lanes
  • Improved road safety and traffic flow
  • Reduced traffic congestion
  • Better connected path access